I've just bought a Vector Watch (Brushed Steel Luna with a black leather strap) to replace my Band 2. I like it for the most part, but I cannot figure out how to change the order of the watch faces. The only way to do this seems to be removing all of them and then adding them in the order you'd like them to appear. Surely that can't be the only way to do this? Any advice?
Edit: Oh and I'm using a Lumia 950 XL.
Edit: Oh and I'm using a Lumia 950 XL.
Last edited: