1. Sargon Aelther's Avatar
    I've just bought a Vector Watch (Brushed Steel Luna with a black leather strap) to replace my Band 2. I like it for the most part, but I cannot figure out how to change the order of the watch faces. The only way to do this seems to be removing all of them and then adding them in the order you'd like them to appear. Surely that can't be the only way to do this? Any advice?

    Edit: Oh and I'm using a Lumia 950 XL.
    Last edited by Sargon Aelther; 05-29-2016 at 02:21 PM. Reason: Added Phone
    05-29-2016 02:20 PM
  2. robdogwoof's Avatar
    Hi there. It's the watch working with the 950xl for all the advertised features. It's not listed as compatible with that phone, but it's the sort of watch I'm interested in...
    Apologies for the question and no helpful answer...
    06-06-2016 05:55 AM
  3. GgEeSsBb's Avatar
    I've just bought a Vector Watch (Brushed Steel Luna with a black leather strap) to replace my Band 2. I like it for the most part, but I cannot figure out how to change the order of the watch faces. The only way to do this seems to be removing all of them and then adding them in the order you'd like them to appear. Surely that can't be the only way to do this? Any advice?

    Edit: Oh and I'm using a Lumia 950 XL.
    In the phone app hold your finger on a watch face and slide it left or right.
    I'm using Android.
    Cheers.
    07-10-2016 10:09 AM
  4. Sargon Aelther's Avatar
    It is fully compatible with 950XL.
    07-10-2016 10:12 AM
  5. Sargon Aelther's Avatar
    In the phone app hold your finger on a watch face and slide it left or right.
    I'm using Android.
    Cheers.
    That does nothing. The only way you can move a watch face is up, which deletes it.
    07-10-2016 01:16 PM
  6. GgEeSsBb's Avatar
    That does nothing. The only way you can move a watch face is up, which deletes it.
    On mine, using Android and Vector updated to latest version 1.5, holding your finger on the face you move it down to the X to delete it but moving it left or right instead re-orders it. I can't comment on any other phone platforms.
    07-10-2016 06:23 PM
  7. Sargon Aelther's Avatar
    And so the official answer is that it's impossible on WP. Typical...
    https://vectorwatch.zendesk.com/hc/e...-of-watchfaces
    07-29-2016 09:08 PM
  8. DavidinCT's Avatar
    And so the official answer is that it's impossible on WP. Typical...
    https://vectorwatch.zendesk.com/hc/e...-of-watchfaces
    So it does not fully support Windows Phone.....Hmmmmm
    08-10-2016 10:53 PM

Similar Threads

  1. Why is my Lumia 540 suddenly taking forever to charge?
    By Windows Central Question in forum Microsoft Lumia 540
    Replies: 1
    Last Post: 05-29-2016, 01:55 PM
  2. How to change the default OneDrive folder location on Windows 10
    By WindowsCentral.com in forum Windows Central News Discussion
    Replies: 0
    Last Post: 05-29-2016, 12:11 PM
  3. Can't find the new, official Share.it app in the Windows Phone store?
    By Windows Central Question in forum Applications
    Replies: 1
    Last Post: 05-29-2016, 11:10 AM
  4. Get a second free controller and price discount when you buy the Xbox One
    By WindowsCentral.com in forum Windows Central News Discussion
    Replies: 0
    Last Post: 05-29-2016, 10:30 AM
  5. Microsoft Band 2's $75 discount price of $175 gets extended until July 9
    By WindowsCentral.com in forum Windows Central News Discussion
    Replies: 0
    Last Post: 05-29-2016, 10:11 AM
LINK TO POST COPIED TO CLIPBOARD