Actually its cool getting new gizmos onto the production floor. Got some real neat machines in over the last 12 months. Currently trying to bring two more in, hopefully up and running in the next year or so. Keep in mind, the production lead time on some of these machines is over 4 months, then shipping from either Europe or Asia, usually 2 weeks in customs at LAX and then installation, startup issues, training etc.
I used to do that when I was in manufacturing. I used to like hanging out in the test area. Always liked playing around with the high horsepower motors.
Actually its cool getting new gizmos onto the production floor. Got some real neat machines in over the last 12 months. Currently trying to bring two more in, hopefully up and running in the next year or so. Keep in mind, the production lead time on some of these machines is over 4 months, then shipping from either Europe or Asia, usually 2 weeks in customs at LAX and then installation, startup issues, training etc.